SKU: PR000044975

Lifetime Impact 44" Polyethylene Basketball Backboard and Rim Combo, (Model 90703)-Outdoor Play, 1 per pack

  • Available in Stock

$100.00

Lifetime Impact 44" Polyethylene Basketball Backboard and Rim Combo, (Model 90703)-Outdoor Play, 1 per pack - This backboard combo from Lifetime Products features a 44-Inch Impact Backboard and a black Classic Rim. The Impact backboard is molded of high-density polyethylene and has UV-protected, fade-resistant graphics. The 18 in. rim is made of 5/8 in. solid steel with 1/2 in. steel braces and includes a heavy-duty nylon net. The universal mounting bracket is available for purchase and provides a solid attachment when mounting the backboard directly to a roof, eave or wall. So enjoy the versatility of a backboard combo from Lifetime Products and play the game the way you want.

Lifetime Impact 44" Polyethylene Basketball Backboard and Rim Combo, (Model 90703)-Outdoor Play

  • Backboard:
  • Rim:
  • Backboard Size: 44 in.
  • Backboard Dimensions: 43.38" x 28" x 1.25"
  • Backboard Surface: High-Density Polyethylene
  • Backboard Type: Impact
  • Rim: Classic
  • All-Weather Net Weight: 70g
  • Mounting Hardware Sold Separately. 

Warranty information

5 Year Limited Warranty

WARNING: This product can expose you to chemicals including nickel (metallic), which is known to the State of California to cause cancer.  For more information go to www.P65Warnings.ca.gov.

Secure & fast payments

Feel reassured with our secure payment options.

Free delivery

Free delivery on every order, every time.

Easy returns

Simple, stress-free returns within 7 days.

24/7 Support

Help available 24/7 for all inquiries.